Perth’s most iconic education build yet. 30+ spaces in Stage 1 in <2 weeks
A pivotal project named after one of the country’s greatest leaders. Iconic architecture, with frontline technology at its core, and a build that will etched in Perth’s history. Subiaco Oval, an oval with a rich nostalgic sporting history, was to become a part of the build of this secondary college.
K2AV was honoured to be awarded the entire design, consulting, and roll-out of the entire audio visual technology that would drive the success of this new build. K2AV was given an unfathomable timeframe to install the solutions prior to the college opening its doors in 2020.
Working with the executive team over a period of 18 months. Promethean’s premium Titanium interactive screens were installed in all teaching spaces, with mobile video conferencing solutions using Crestron’s conferencing sound bar, and a larger presentation space was equipped with a low-profile audio visual solution to allow for presentations and collaboration, with aesthetics being a high priority.
30+ spaces were rolled out, many with full automation, in the timeframe to allow the college to be fully equipped from day one.